
BEHIND THE BOTTLE
A closer look at Springora.
Explore the plant, laboratory and published quality documents.
Inside Springora
Our plant, laboratory & office
Three connected parts of our Islamabad facility.



RO plant & production details
Water treatment process
From protected spring water to finished bottle.
A documented sequence of treatment, hygienic filling, batch review and release.
Source & storage
Protected spring water is received into controlled raw-water storage.
Pre-treatment
Sand, carbon, softening and 5-micron filtration prepare the water for RO.
RO refinement
Reverse osmosis provides the main controlled purification stage.
Mineral balance
Selected minerals are balanced for a consistent finished-water profile.
Ozone & UV
Ozonation and UV sterilisation add controlled treatment safeguards.
Hygienic filling
Bottles are rinsed, filled, capped, coded, labelled and packed.
Batch testing
The quality team reviews physical, chemical and microbiological results.
Release & dispatch
Only reviewed finished batches proceed to storage and customer delivery.
Finished production
Filled, capped and prepared for dispatch.
These documentary production views show finished Springora bottles after filling and capping, ready for controlled storage, order preparation and delivery.
Laboratory & testing equipment
In-house quality control
A proper laboratory workflow—not a visual claim.
Every finished-water batch is reviewed by the quality team. Laboratory work follows documented SOPs, controlled records and a quarterly instrument calibration schedule.







Office & facility layout
Facility at a glance
One coordinated production environment.
A compact planning view brings the plant, laboratory, office and empty-bottle storage together without interrupting the facility story.
Registration & test evidence
Quality claims backed by documents.
Public summaries below reflect the supplied licence and laboratory reports. Full test reports are available for review.
Islamabad Food Authority
Licensed food business
- Licence number
- IFA/M-C/008841
- Licence duration
- July 2026 – June 2027
- Business
- Springora Bottled Drinking Water
- Owner
- Ali Gul
National Institute of Health
Independent sample test
NIH Nutrition Division tested a Springora 1.5 L sample. The report records the sample as satisfactory for the tests performed.
Islamabad Diagnostic Centre
Bacteriological Examination of Water
The supplied Water Plant sample was collected on 04 July 2026. The final report, issued 07 July 2026, records total viable colony count, total coliform, Pseudomonads, Enterococcus faecalis and confirmed E. coli as Nil /100 mL.
SPRINGORA IN-HOUSE QUALITY CONTROL LABORATORY
Controlled batch report: PASS – COMPLIANT
Report SPR/IHQC/BDW/2026-003 records the finished 1.5 L batch SP280726A, dated 29 July 2026.
View full in-house report
| Selected parameter | In-house result | Status |
|---|---|---|
| Turbidity | 0.0 NTU | PASS |
| pH | 7.3 | PASS |
| Total dissolved solids | 170 mg/L | PASS |
| Total coliform | 0 MPN/100 mL | PASS |
| E. coli | Nil / 100 mL | PASS |
| Fluoride | 0.6 mg/L | PASS |
